Geotextile tube applications for construction of the longest sea-crossing bridge in Vietnam
Geotextile tube applications for construction of the longest sea-crossing bridge in Vietnam

Geotextile tubes were indispensable in the bridge building works of the Lach Huyen Port Project. About 27 km of the material was utilised to construct the containment bund of the 620,000 m3 dredged sediment containment facilities.

Subsoil Improvement Works at DVIZ, Haiphong, Vietnam
Subsoil Improvement Works at DVIZ, Haiphong, Vietnam

As Vietnam seeks a balance between preserving land for agriculture and finding space for industry, creating new land is one solution. But waiting for subsoil to settle naturally at reclamation sites is time-consuming and costly.

Macro and Micro Dredging as a Tool for Mitigating Floods and Droughts in the Red River Delta, Vietnam
Macro and Micro Dredging as a Tool for Mitigating Floods and Droughts in the Red River Delta, Vietnam

This article covers the initial environmental examination and the development of mitigation measures against adverse impacts of physical works. Detailed investigations of water and groundwater, and sediment and soils support the assessment, backed by field surveys.