Joop van der Meer

Joop van der Meer worked for many years in civil engineering with international consultants. In 2000 he joined Van Oord DMC as a senior engineer at the Engineering Department. He is primarily involved with projects which have a special emphasis on geotechnical aspects related to land reclamation, retaining- and offshore structures.

 

Share this page

Articles By Joop van der Meer

Immediate displacement of the seabed during Subsea Rock Installation (SRI)
Immediate displacement of the seabed during Subsea Rock Installation (SRI)

The immediate displacement of the subsoil, and therefore the need for extra volumes of rock, can be accurately determined as long as sufficient geotechnical information on the seabed is available. Van Oord dredging and marine contractors has extensive experience in installing subsea rock by using flexible fallpipe techniques.

DOWNLOAD PDF Document | 782,67 KB