Chris Dykstra

Chris Dykstra graduated from Delft University (Mining) in 1979 and has been working ever since for Boskalis: as a research engineer, dredging engineer, site engineer on various projects abroad and since 1996 as senior engineer with Boskalis’ engineering company, Hydronamic. He was closely involved with the Betuwe Route (BR1/2) project from tender to construction stage, in the role of team leader for geotechnical embankment design.

Share this page

Articles By Chris Dykstra

Recent Innovations in the Design and Construction of Railway Embankments.
Recent Innovations in the Design and Construction of Railway Embankments.

Two major railway lines, the Betuwe Route (BR) and the High Speed Railway Line (HSL), are currently under construction in The Netherlands.