Chris Dykstra
Chris Dykstra graduated from Delft University (Mining) in 1979 and has been working ever since for Boskalis: as a research engineer, dredging engineer, site engineer on various projects abroad and since 1996 as senior engineer with Boskalis’ engineering company, Hydronamic. He was closely involved with the Betuwe Route (BR1/2) project from tender to construction stage, in the role of team leader for geotechnical embankment design.
Articles By Chris Dykstra

Recent Innovations in the Design and Construction of Railway Embankments.
Authors: Chris Dykstra | Art Nooy van der Kolff
Two major railway lines, the Betuwe Route (BR) and the High Speed Railway Line (HSL), are currently under construction in The Netherlands.