Articles in this issue

Partnering: The Right Procurement Tool for Risky Contracts
Terra et Aqua 98 – complete issue

Read the complete issue containing articles, upcoming events, an interview and book review.

DOWNLOAD PDF Document | 1,05 MB
Partnering: The Right Procurement Tool for Risky Contracts
Partnering: The Right Procurement Tool for Risky Contracts

Despite the recent progress, partnering in the UK continues to mean different things to different people. The difference between project and strategic partnering is fundamental and could reflect the difference between a client’s desire to partner on a short-term or long-term basis.

DOWNLOAD PDF Document | 600,33 KB
Design Aspects for Cutter Heads Related to the Mixture Forming Process When Cutting Coarse Materials
Design Aspects for Cutter Heads Related to the Mixture Forming Process When Cutting Coarse Materials

Spillage, defined as the soil that is cut during the dredging process but not sucked up by the suction pipe, reduces the productivity of the cutter suction dredger and therefore needs to be minimised.

DOWNLOAD PDF Document | 788,5 KB
Framework for Research Leading to Improved Assessment of Dredge Generated Plumes
Framework for Research Leading to Improved Assessment of Dredge Generated Plumes

There are two types of driving force that urge us to assess the effects of dredge-generated plumes, a genuine concern for the environment and the regulations that forbid us to dredge unless we can demonstrate that harm will not be caused to the environment.

DOWNLOAD PDF Document | 313,95 KB
Partnering: The Right Procurement Tool for Risky Contracts
98
Published March 2005