New article: "Valuing Variations In Dredging Contracts"

New article: "Valuing Variations In Dredging Contracts"

3 May 2017

“Valuing Variations In Dredging Contracts”

Author: David Kinlan

Variations are essential in dredging contracts and they have the potential to generate extra costs and pose significant delay to projects. So, what is the best way to go about reaching a fair valuation in variations in dredging contracts?

 

DOWNLOAD

Please click here to download the article “Valuing Variations In Dredging Contracts”.

Optimal channel design